Projects Network Surveying

PODONÖ2, Pottendorfer Linie Niederösterreich, Abschnitt 2, Lower Austria
ÖBB Infrastruktur AG
Marking of survey points, initial measurment and calculative evaluation of a ca. 12km long control point network; continuing network services
since 2017
PODONÖ1, Pottendorfer Linie Niederösterreich, Section 1, Lower Austria
ÖBB Infrastruktur AG
Marking of survey points, initial measurment and calculative evaluation of a ca. 15km long control point network; continuing network services
since 2015
TWIN, Terminal Vienna Inzersdorf
ÖBB Infrastruktur AG
Marking of survey points; determination of the pillar´s positions; initial measurement by means of GPS, tachymetry and precision leveling; network calculations; technical report; network services
2013 - 2016
 
VOS7, Verbindung Ostbahn - Flughafenschnellbahn S7, Vienna - Lower Austria
ÖBB Infrastruktur AG
Marking of survey points; network measusurement; network calculations; network service while constructing 
2012 - 2014
 
Conrad-Observatorium – Baustufe 2 , Trafelberg, Lower Austria
BIG - Bundesimmobiliengesellschaft
Tunnel portal network (survey and evaluation)
Main control survey in the tunnel
2010
Bauabschnitt U2/20 "Pilgramgasse", Vienna
Wiener Linien
Creation of a fixed point field on the surface and at all levels, including for the tunnel heading. Manual and automatic deformation measurements in the shaft structures, control measurements (including bored piles, driving direction, inner shell, etc.). Surveying for track construction, steel construction and interior construction.
Since 2021