Projects Network Surveying
PODONÖ2, Pottendorfer Linie Niederösterreich, Abschnitt 2, Lower AustriaÖBB Infrastruktur AGMarking of survey points, initial measurment and calculative evaluation of a ca. 12km long control point network; continuing network servicessince 2017
PODONÖ1, Pottendorfer Linie Niederösterreich, Section 1, Lower AustriaÖBB Infrastruktur AGMarking of survey points, initial measurment and calculative evaluation of a ca. 15km long control point network; continuing network servicessince 2015
Bauabschnitt U2/20 "Pilgramgasse", ViennaWiener LinienCreation of a fixed point field on the surface and at all levels, including for the tunnel heading. Manual and automatic deformation measurements in the shaft structures, control measurements (including bored piles, driving direction, inner shell, etc.). Surveying for track construction, steel construction and interior construction.Since 2021